A clear, structured path from first conversation to launched product — with defined checkpoints at every stage so you always know where things stand.

The six stages

How a project moves forward

Every engagement follows the same framework, adapted to the size and stage of your product. Each stage has a deliverable you keep and an exit condition that has to be true before the next one starts.

01

Discover

We learn about your business, users, goals, constraints, and technical requirements.

You get
A written discovery brief, a prioritised list of assumptions, and a recommendation on scope.
Done when
You and we agree on which problem is worth solving first and which parts of it are out of scope for the first release.
We need from you
Two or three 60-minute sessions with the people who know the business, plus access to any existing analytics or research you already have.
Typical duration
Typical duration: 1–2 weeks
02

Plan

We define the scope, architecture, priorities, technology choices, and delivery roadmap.

You get
An architecture note, a data model, a phase-by-phase scope and estimate, and a named risk list with mitigations.
Done when
Each phase has a fixed scope, an estimate and an exit condition, and the highest-risk technical assumption has been tested or explicitly accepted.
We need from you
Confirm the priorities and the budget envelope, and be available to arbitrate trade-offs within a day rather than a week.
Typical duration
Typical duration: 1–2 weeks
03

Design

We create user flows, wireframes, prototypes, and polished interfaces before development.

You get
User flows, wireframes, high-fidelity UI, a component library with documented states, and a written behaviour spec covering empty and error states.
Done when
The flows are approved end to end, and the edge cases that usually surface after the build — empty, error, permission-denied, offline — are designed rather than improvised.
We need from you
Consolidate feedback into a single voice per decision. Multiple stakeholders giving opposing direction is the most common cause of a stalled design phase.
Typical duration
Typical duration: 2–4 weeks
04

Build

Our engineers develop the product with clean architecture, testing, security, and maintainability in mind.

You get
The working product behind a preview environment, a test suite, a deployment pipeline, and documentation as it is written rather than retrofitted.
Done when
The agreed acceptance criteria pass in CI, no known severity-one defects remain open, and a non-engineer on your team can deploy a change.
We need from you
Continuous access to a staging environment, realistic test data, and a decision-maker available for questions inside a working day.
Typical duration
Typical duration: 6–16 weeks
05

Launch

We prepare the production environment, deploy the product, monitor performance, and resolve launch issues.

You get
A production deployment with monitoring, alerting and a rollback path, plus a runbook and an incident process we have rehearsed.
Done when
Error rate, latency and Core Web Vitals are inside the agreed budget on production-shaped data, and the rollback path has been tested rather than assumed.
We need from you
Own the go/no-go decision and the communication plan. We will tell you when we do not recommend launching; the decision stays yours.
Typical duration
Typical duration: 1 week + stabilisation
06

Improve

After launch, we continue improving the product based on user feedback, business needs, and new opportunities.

You get
A prioritised backlog fed by real usage data, with a monthly release and a written note on what changed and what it moved.
Done when
Each cycle ends with a shipped, measurable change. Metrics are reviewed against the baseline captured at launch.
We need from you
Keep using the product and keep telling us where it does not fit your work. That feedback is the input to everything we build next.
Typical duration
Typical duration: Ongoing, monthly

FAQ

Questions about working with us

The questions clients ask before committing to a process.

How long does a software project take end to end?
For a mid-sized product the six stages run roughly 12 to 26 weeks in total. Discovery and planning take one to two weeks each, design two to four, build six to sixteen, launch one week plus stabilisation, and improvement is ongoing. The range that actually decides your date is the build stage, and that is set by scope rather than by us.
What do you need from us to start?
A description of the problem, two or three people who can answer questions about it, and access to the domain and third-party accounts the build depends on. Existing brand assets and design files help but are not a prerequisite.
Who owns the source code and the designs?
You do, on final payment, and the arrangement is written into the agreement before work begins rather than negotiated at the end. That covers source code, infrastructure configuration, design files and the component library.
How do you handle changes to scope mid-project?
We re-baseline rather than absorb it silently. A change is either swapped for something of equivalent size in the same phase, or it moves into the next phase, or it is quoted separately. You always see the schedule impact before deciding, and we do not raise the total quietly.
What happens if the project needs to pause?
We document the current state, rotate any credentials that were project-specific, and hand over what exists. If the project resumes, we start from the handover notes rather than from memory.
Do you support the product after launch?
Yes. Post-launch work runs as a monthly retainer covering monitoring, dependency and security updates, and a standing block of development hours, or as per-project work if you would rather not commit to a retainer.